(254) 799-0291 Construction, Construction Company, General Contractors

Mazanec
Construction

Mazanec Construction Mazanec Construction Mazanec Construction

Mazanec
Construction

Mazanec Construction Mazanec Construction Mazanec Construction
  • Home
  • Current Projects
  • Upcoming Projects
  • Portfolio
  • JIM TURNER BODY SHOP
  • More
    • Home
    • Current Projects
    • Upcoming Projects
    • Portfolio
    • JIM TURNER BODY SHOP

(254) 799-0291 Construction, Construction Company, General Contractors


  • Home
  • Current Projects
  • Upcoming Projects
  • Portfolio
  • JIM TURNER BODY SHOP

LA Vega ISD

La Vega's Early College High School

This new 67,000 SF facility on the La Vega High School campus will serve as the home for La Vega's Early College High School and CTE/P-Tech programs. It includes 16 classrooms, labs for welding, CNA/CMA, culinary arts, science, and computer studies, as well as a lecture hall. Designed as a "crown jewel" for La Vega ISD, the building is close to the existing high school yet stands independently.

La Vega Early College High School WIP Images

Show More

Ground Breaking Ceremony

    La Vega ISD Field House

    A 7,000sf expansion of La Vega’s HS Field House facility that will allow space within the 14,000sf existing building to be reconfigured and repurposed.  The new addition will house all the weight room equipment and triple the amount of space from the existing weight room.  The new weight room will have large floor-to-ceiling windows that look out towards the football field and from the football field you will see large school logos and signage paying tribute to previous championship teams.  The former weight room area will be converted into new locker rooms, laundry facilities, a large film room and several smaller team meeting rooms.

    Photo Gallery

    Show More

    La Vega ISD - Multi-Program Activity Center

    Details Coming Soon

    La Vega - JR High Addition

      LA VEGA FOOTBALL STADIUM

      Football Stadium

      Details Coming Soon

      WIP - LA VEGA FOOTBALL STADIUM

        LA VEGA ISD ELEMENTARY

        LA VEGA ISD ELEMENTARY

        La Vega ISD Elementary WIP Images

          LA VEGA ISD PRIMARY

          LA VEGA ISD PRIMARY

          La Vega ISD Primary WIP Images

            La Vega ISD Intermediate Gym

            Intermediate Gym

            The new La Vega Intermediate Gym is an approximately 8,000 square foot gymnasium addition that will feature a wood gym floor for basketball and volleyball and includes locker rooms and bathrooms. The structure is freestanding and located between the district’s administration building and existing gymnasium. This building will be a storm shelter built to ICC-500 building codes consisting of structural block walls and a concrete roof.  

            The project scope of work includes an extensive re-routing of existing utilities, a control room for the storm shelter, six motorized basketball goals, scoreboards and an aluminum storefront entrance. The new construction will blend nicely with the other buildings on campus and will give the staff and students some much-needed extra space to enjoy their athletics program.  

            WIP INTERMEDIATE GYM

              Rave Reviews from Happy Customers

              Copyright © 2018 Mazanec Construction - All Rights Reserved.

              Powered by

              • Current Projects
              • Portfolio
              • 360 VR Projects
              • About Us
              • Meet The Team
              • Services