(254) 799-0291 Construction, Construction Company, General Contractors

Mazanec
Construction

Mazanec Construction Mazanec Construction Mazanec Construction

Mazanec
Construction

Mazanec Construction Mazanec Construction Mazanec Construction
  • Home
  • Current Projects
  • Upcoming Projects
  • Portfolio
  • JIM TURNER BODY SHOP
  • More
    • Home
    • Current Projects
    • Upcoming Projects
    • Portfolio
    • JIM TURNER BODY SHOP

(254) 799-0291 Construction, Construction Company, General Contractors


  • Home
  • Current Projects
  • Upcoming Projects
  • Portfolio
  • JIM TURNER BODY SHOP

BRIC AEROSPACE LAB

BRIC Aerospace Lab

This project includes the buildout of multiple lab spaces for two different research groups, spread across two floors of the BRIC facility. On the first floor, is the build-out of an existing 2,700SF shell space for an Aerospace Engineering Lab. On the second floor, is the build-out of approximately 3,700SF of existing shell space on the second floor of the BRIC to expand the adjacent 


Materials testing lab for the Mechanical Engineering Department. Both buildouts will include minor demolition, new finishes, millwork, flooring, MEP systems, data networking, and door access control.  This project is scheduled for completion by the end of Summer 2026.

B.R.I.C. 1st Floor Lab WIP

B.R.I.C. 2nd FLOOR LAB WIP

    Copyright © 2018 Mazanec Construction - All Rights Reserved.

    Powered by

    • Current Projects
    • Portfolio
    • 360 VR Projects
    • About Us
    • Meet The Team
    • Services