(254) 799-0291 Construction, Construction Company, General Contractors
(254) 799-0291 Construction, Construction Company, General Contractors
As part of the 2019 bond program, a 114,784 SF renovation will occur at Midway Middle School to convert it from a 7th and 8th grade center to a 6th, 7th, and 8th grade center, with a campus capacity of approximately 1,320 students. The renovation areas will include the Classrooms, Labs, Commons, Main Corridors, Administration, and adjacent Restroom facilities. There will be multiple collaboration areas with writable surfaces, technology, and flexible furniture to allow classroom instruction and projects to extend beyond the classroom walls.
These spaces are integrated into the classroom neighborhoods, which will result in supervision from multiple classrooms. The renovation will include rework of the entry drive of the building where a parking lot and current bus drop-off exists. It will include parking reconfiguration on the North side of the building as well as outdoor seating areas at the existing South area.
Copyright © 2018 Mazanec Construction - All Rights Reserved.
Powered by GoDaddy