(254) 799-0291 Construction, Construction Company, General Contractors

Mazanec
Construction

Mazanec Construction Mazanec Construction Mazanec Construction

Mazanec
Construction

Mazanec Construction Mazanec Construction Mazanec Construction
  • Home
  • Current Projects
  • Upcoming Projects
  • Portfolio
  • JIM TURNER BODY SHOP
  • More
    • Home
    • Current Projects
    • Upcoming Projects
    • Portfolio
    • JIM TURNER BODY SHOP

(254) 799-0291 Construction, Construction Company, General Contractors


  • Home
  • Current Projects
  • Upcoming Projects
  • Portfolio
  • JIM TURNER BODY SHOP

Baylor Univeristy Dining Hall

Memorial Dining Hall

Memorial Dining Hall

The dining hall is located on the Baylor campus.  This remodel involved the kitchen, serving, takeout, and dining areas,  We brought in the color, introduced metal accents and created a fresh trendy look to the once dated dining area.

Photo Gallery

    the club house

    BU Club House

    This is a two story, 3,000 sq. ft. club house located on the Baylor University practice field.  This is a new structure for this site.  We have worked with Baylor University on several other projects and we were honored to be partners with this new venture.

    Baylor Univeristy Golf Club House

    Final Video

    VR 360 - Entire Building

    Photo Gallery

      VR 360 - Driving Range with open doors

      During Construction

        Exterior Video

        360 VR Tour Baylor univeristy golf club house

        Photo Gallery

          Photo Gallery

          Show More

          bu Bear Habitat

             MazCon has been hired to construct a new Off-Site Bear Habitat for the remaining mature bear, “Lady”.  Lady’s new home will be built on University-owned property located right off University Parks Dr. just East of the La Salle intersection.  The property currently contains a large fenced area with climbing obstacles, tires, trees, and plenty of room to expend energy throughout the day.  

           The new 1,100sf building will consist of load-bearing CMU walls, steel beams for the roof structure and a “Baylor Green” metal roof to match the campus standard look and color scheme.  Within the building there will be 2 bear enclosure areas with automated sliding gates that will open up directly into the existing fenced play area for easy access.  The building will also contain a small workroom and a restroom for the trainers when on site.   

          Copyright © 2018 Mazanec Construction - All Rights Reserved.

          Powered by

          • Current Projects
          • Portfolio
          • 360 VR Projects
          • About Us
          • Meet The Team
          • Services